Requested:
In the factory producing steel rolls, the acids used in the process evaporated and accumulated on the lifelines that were previously built on demand (catways, crane paths, between switches, on the cranes), thus the lifeline system was severely damaged.
How did we solve it?
As soon as it was detected, all lifelines were disabled and removed. Then, R&D studies were carried out together with the FallProtec engineering department, of which we distribute. Acid-resistant brackets, rope and lifeline components were produced. Thus, the installation of lifelines in these acid-affected areas was completed with specially produced components. In this way, lifeline systems that are not affected by acid vapor were installed.
How long did it take?
20 days