Explore the Features
Arcelor Mittal (Borcelik)
Horizontal lifelines; total of 28,000 m of lifeline was installed on the roofs, in steel structures under the roof, in places where cable ducts pass, on pipe bridges, on crane roads, on cranes, in treatment facilities, and in overhead lines. 120 vertical lifelines with a total length of 1200 m were installed.